{"id":3801,"date":"2016-09-18T17:05:16","date_gmt":"2016-09-18T15:05:16","guid":{"rendered":"http:\/\/www1.asja.energy\/en\/?p=3801"},"modified":"2025-08-06T17:12:53","modified_gmt":"2025-08-06T15:12:53","slug":"wind","status":"publish","type":"post","link":"https:\/\/www.asja.energy\/en\/activities\/wind\/","title":{"rendered":"Wind"},"content":{"rendered":"[vc_row][vc_column][vc_column_text]\n<h3><strong>Asja\u00a0designs, builds and operates wind farms.<\/strong><\/h3>\n<p>Our widespread network of skilled on-site personnel and a highly qualified in-house technical staff allows for greater flexibility at handling complex projects. We are a long-standing and creditworthy partner of major Italian and international banking firms, so we can act as guarantor and one-stop partner for any project. We have built 10 wind farms totalling <strong>127.3 MW of installed capacity<\/strong>.<\/p>\n[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator color=&#8221;green&#8221; align=&#8221;align_left&#8221; el_width=&#8221;20&#8243;][vc_column_text]\n<h3><strong>Asja\u2019s expertise includes:<\/strong><\/h3>\n<ul>\n<li>site identification<\/li>\n<li>wind metering<\/li>\n<li>environmental impact assessment and study<\/li>\n<li>handling of licence\/permit issuance process and relations with stakeholders<\/li>\n<li>plant construction and operation<\/li>\n<li>green certificates trading<\/li>\n<li>sale of electricity<\/li>\n<li>institutional relations<\/li>\n<\/ul>\n[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator color=&#8221;green&#8221; align=&#8221;align_left&#8221; el_width=&#8221;20&#8243;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/3&#8243;][\/vc_column][vc_column width=&#8221;1\/3&#8243;][\/vc_column][\/vc_row]\n","protected":false},"excerpt":{"rendered":"<p>Asja designs, builds and operates wind farms. Our widespread network of skilled on-site personnel and a&#8230;<\/p>\n","protected":false},"author":1,"featured_media":8963,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[35],"tags":[10149,10091],"_links":{"self":[{"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/posts\/3801"}],"collection":[{"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/comments?post=3801"}],"version-history":[{"count":15,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/posts\/3801\/revisions"}],"predecessor-version":[{"id":12049,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/posts\/3801\/revisions\/12049"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/media\/8963"}],"wp:attachment":[{"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/media?parent=3801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/categories?post=3801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/tags?post=3801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}