{"id":7148,"date":"2018-07-26T12:21:53","date_gmt":"2018-07-26T10:21:53","guid":{"rendered":"http:\/\/www.asja.energy\/?p=7148"},"modified":"2019-07-22T11:11:56","modified_gmt":"2019-07-22T09:11:56","slug":"asja-is-building-a-new-biogas-plant-in-brazil","status":"publish","type":"post","link":"https:\/\/www.asja.energy\/en\/news-en\/asja-is-building-a-new-biogas-plant-in-brazil\/","title":{"rendered":"Asja is building a new biogas plant in Brazil"},"content":{"rendered":"<p>26.07.2018<\/p>\n<p>A new landfill <strong>biogas-to-energy plant<\/strong> with installed capacity of <strong>12,8 MW<\/strong> is currently under construction in <strong>Jaboat\u00e3o dos Guararapes<\/strong>, Brazil. With this project, that will be completed by <strong>2019<\/strong>, Asja is strengthening its presence in the country\u2019s renewable energy sector.<\/p>\n<p>Asja has already built three biogas plants in Brazil, the last of them being <a href=\"https:\/\/www.asja.energy\/en\/news-en\/asja-continues-to-grow-brazil-new-biogas-plant-inaugurated\/\" target=\"_blank\" rel=\"noopener\">opened in September 2017 at Sabar\u00e0 landfill<\/a>.<\/p>\n<p>The new plant will have a positive impact on the local community, since it will generate about <strong>95,000 MWh<\/strong> of clean energy yearly, enough to meet the energy needs of <strong>52,000 people<\/strong> and to prevent the emission of more than <strong>300,000 ton of CO2<\/strong>.<\/p>\n<p>Asja has already signed <strong>two power purchase agreements<\/strong> with main local companies that guarantee the sale of part of the nominal capacity of the plant for 5 years. These agreements are <strong>consistent with the payback period<\/strong> of the project and thus will provide for the repayment of the investment. <a href=\"https:\/\/www.db.com\/italia\/index_en.htm\" target=\"_blank\" rel=\"noopener\"><strong>Deutsche Bank<\/strong><\/a> has provided financial support to the project by granting a 6 million euro loan over 5 years.<\/p>\n<p>\u201c<em>I\u2019m very satisfied with this operation, that will allow us to stregthen our presence in Brazil in the productioon of renewable power from biogas, a sector in which we have been market leader in Italy for more than 20 years<\/em>\u201d is the comment of Asja\u2019s founder and chairman <strong>Agostino Re Rebaudengo<\/strong>, that continues \u201c<em>The plant in Jaboat\u00e3o, one of the largest in terms of installed capacity we have ever built, is a perfect example of the ability of the Italian green companies to succesfully export their competencies and technology. Once more, Deutsche Bank has been a key partner in our internationalization process, after having provided financial support to Sabar\u00e0 project and promoted <a href=\"https:\/\/www.asja.energy\/news\/asja-fa-il-suo-ingresso-nel-programma-elite\/\" target=\"_blank\" rel=\"noopener\">the entry of Asja<\/a> in London Stock Exchange Group\u2019s ELITE program. Asja doesn\u2019t stop here: we have more project in pipeline in Brazil, an ever more important market in our plans<\/em>\u201d.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>26.07.2018 A new landfill biogas-to-energy plant with installed capacity&#8230;<\/p>\n","protected":false},"author":1,"featured_media":7147,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[39,10166],"tags":[10063,10156,10085,10139],"_links":{"self":[{"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/posts\/7148"}],"collection":[{"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/comments?post=7148"}],"version-history":[{"count":4,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/posts\/7148\/revisions"}],"predecessor-version":[{"id":7816,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/posts\/7148\/revisions\/7816"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/media\/7147"}],"wp:attachment":[{"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/media?parent=7148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/categories?post=7148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.asja.energy\/en\/wp-json\/wp\/v2\/tags?post=7148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}